Monday, February 14, 2011
Wednesday, February 9, 2011
Feb. 9th Log
Got the Syllabus today and began planning out time frames for when I will do the Tri-Fold board.
Monday, February 7, 2011
Assembly
Tether Supplies
- Thermostat wires
- Quick disconnects (Male)
Tether Assembly
- Cut two 20m lengths
- Strip both ends of all wires 2 inches
- Crimp male quick disconnects on each end of each wire
- Zip-tie all wires together at 1m increments
Controller Supplies
- Thermostat wires
- 5 double pole double throw center off switches
- 2 single pole single throw switches
- Female disconnects
- Tupperware container
Controller Assembly
- Cut slits into the lid of the Tupperware
- Cut slits into the bottom of the Tupperware
- Cut 1/2m of thermostat wire
- Strip both ends of all thermostat wire
- Insert switches into the slits
- Crimp female disconnects to on end of the wire
- Wire the Switches
Motor Supplies
- Atwood 3000 Motor
- 1m thermostat wire
- Hose clamps
- Zip-ties
Motor Assembly
- Cut thermostat wire
- Splice to motor
- Crimp female disconnects
Camera Assembly
- Crimp female disconnect to POWER wire
- Crimp female disconnect to VISUAL wire
Tuesday, February 1, 2011
Feb. 1st Log
This week construction takes form and hopefully a the control box will be done by Friday or early next week
Subscribe to:
Comments (Atom)