Gannon: ROV- Electrical
Tuesday, March 15, 2011
Monday, March 14, 2011
March 14 Log
Finishing touches on Poster and laid out the final electrical components.
Wednesday, March 9, 2011
March 9 Log
Working on the poster layout. Waiting for Quick disconnects and motors.
Monday, February 14, 2011
Wednesday, February 9, 2011
Feb. 9th Log
Got the Syllabus today and began planning out time frames for when I will do the Tri-Fold board.
Monday, February 7, 2011
Assembly
Tether Supplies
- Thermostat wires
- Quick disconnects (Male)
Tether Assembly
- Cut two 20m lengths
- Strip both ends of all wires 2 inches
- Crimp male quick disconnects on each end of each wire
- Zip-tie all wires together at 1m increments
Controller Supplies
- Thermostat wires
- 5 double pole double throw center off switches
- 2 single pole single throw switches
- Female disconnects
- Tupperware container
Controller Assembly
- Cut slits into the lid of the Tupperware
- Cut slits into the bottom of the Tupperware
- Cut 1/2m of thermostat wire
- Strip both ends of all thermostat wire
- Insert switches into the slits
- Crimp female disconnects to on end of the wire
- Wire the Switches
Motor Supplies
- Atwood 3000 Motor
- 1m thermostat wire
- Hose clamps
- Zip-ties
Motor Assembly
- Cut thermostat wire
- Splice to motor
- Crimp female disconnects
Camera Assembly
- Crimp female disconnect to POWER wire
- Crimp female disconnect to VISUAL wire